Welcome To b2b168.com, Join Free | Sign In
中文(简体) |
中文(繁體) |
Francés |Español |Deutsch |Pусский |
| No.13597214
![](http://i.b2b168.com/e/tag_pthy.gif)
- Product Categories
- Friendly Links
Information Name: | Ore crushers Cheap | Jincheng Machinery (certified) | ore crusher |
Published: | 2015-05-08 |
Validity: | 0 |
Specifications: | Any |
Quantity: | |
Price Description: | |
Detailed Product Description: | Technical Specifications Model SCF600 × 400 SCF600x600 SCF800x600 SCF800x800 SCF1000x800 SCF1000x1000 maximum feed size ≤200 ≤400 mm mm mm ≤300 ≤450 ≤500 mm mm mm material particle size ≤550 ≤3 mm production capacity of 10-15 tons / hour 20-25 tons / hour 40-50 tons / hour 50-60 tons / hour 70-80 tons / hour 90-100 tons / hour to allow the material moisture content <25% of the motor power 18.5 + 18.5 (15) kw-4 stage 22 + 22 ( 18.5) Kw-4 级 45 + 45 (37) kw-4 级 45 + 55 (45) kw-4 级 55 + 75 (55) Level kw-4 90 + 90 (75) level kw-4 Dimensions 2400x1020x1700 2400x1280x1650 3760x1314x2100 3760x1840x2100 4100x1840x2450 4100x2140x2450 According to the data display, the comprehensive utilization of construction waste is low ore crusher special, in many parts of construction waste without any treatment, he was transported to the suburbs or rural construction units, using simple open dumps or landfills way process ore crushing equipment, and construction waste transport they use non-enclosed truck ore crusher, inevitably lead during transport garbage left removed, dust and sand-lime dust, which seriously affected the city's appearance and landscape . In fact, these construction waste related equipment after the deep processing of re-using, it may make construction waste re-use of equipment is Henan Jincheng Machinery Machinery professionally built construction Disposal of construction waste to break the traditional approach, to achieve a construction waste comprehensive utilization value. According to relevant survey, construction waste removal, usually because of the demolition of construction and the like can be reused after processing, construction waste which can be processed after use are: (1) the construction of road excavation: divided into fragments of broken concrete and asphalt concrete; (2) The demolition of old buildings: two brick and stone, concrete, wood, plastic, plaster and mortar, steel and non-ferrous metals and other categories; (3) Construction garbage: divided the remaining concrete (the project does not use off concrete), the old concrete, mortar and other mineral materials construction debris (chiseled plaster, etc. produced) and the type of wood, paper, metal and other wastes. Ore crushers Cheap | Jincheng Machinery (certified) | ore crusher provided by Gongyi City, Cheng Machinery Manufacturing Company Limited. Gongyi City, Cheng Machinery Manufacturing Co., Ltd. (www.jcjx888.com) is a leader in Zhengzhou, industry-specific equipment, over the years, the company is implementing the scientific management, innovation and development, the principle of honesty and trustworthiness, and satisfy customer needs. In the gold-Machinery leadership with the staff warmly welcome all inquiries negotiations to create a gold-Machinery better future. |
Admin>>>
You are the 35098 visitor
Copyright © GuangDong ICP No. 10089450, Gongyi City Jincheng Machinery Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility
You are the 35098 visitor
Copyright © GuangDong ICP No. 10089450, Gongyi City Jincheng Machinery Manufacturing Co., Ltd. All rights reserved.
Technical support: ShenZhen AllWays Technology Development Co., Ltd.
AllSources Network's Disclaimer: The legitimacy of the enterprise information does not undertake any guarantee responsibility